Project Description
Development of Cairo International Airport (Terminal 2)
PROJECT INFORMATION
This comprised the complete renovation and development of Terminal Building No. 2 (TB2) with all the associated facilities to serve international passenger traffic. Terminal 2 is physically connected to Terminal 3 through the existing Skyway and it is designed to be used concurrently with terminal 3. Works also included the external utilities serving the renovated Terminal 2, airside and landside including Potable Water, Fire Fighting, Sewerage and Storm Drainage Networks.